Bromley Heath Viaduct Cantilevers

Year:  2017

Client: South Gloucestershire Council

Main Contractor: Farrans

Engineer:  WSP / Parsons Brinckerhoff

Moore Concrete Project Approx Value: £50k

Moore Concrete supplied and installed fifty one cantilever rib deck units as part of bridge strengthening works to the 1960s viaduct which carries the A4174 over the River Frome in Bristol.  The slim profile and use of lightweight concrete in the replacement cantilever units reduces the dead load to the structure.

Project challenges included –

The use of lightweight aggregate presented challenges in maintaining a workable concrete mix.  This led to a steep learning curve in order to provided the specified F3 finish.

The concrete mix specification was demanding, 66% GGBS, 50N 28-day cube strength, lightweight aggregate.

Complex geometry, angled soffit,  requiring two secondary pours and protruding reinforcement.

Transport of the units, required bespoke concrete skids which were designed to follow the angled soffit of the units and allow offloading by forklift.

Want More Information?

For further information regarding Cantilever Rib Decks please contact a member of our building sales team on 028 2565 2566, Ext 2.