Linked In: Moore Concrete
twitter | Moore Concrete
Facebook: Moore Concrete
Email: Moore Concrete
Linked In: Moore Concrete
Twitter: Moore Concrete
Facebook: Moore Concrete
Phone: Moore Concrete

BEBO Heysham Bypass

We supplied an Asset BEBO Arch to the Heysham Bypass project to form a bridge over the Milestone Canal.

Along with Asset International for main contractor Costain, we were awarded a Certificate of Excellence at the 2015 Concrete Society Awards. At the time it was the largest precast overfill arch in the world.

The Heysham to M6 Link Road was of high priority to the transport sector in Lancashire. The new road connected Heysham and Morecambe peninsula to Junction 34 of the M6. The dual carriageway includes a footpath and cycleway along the entire route.

The T94 Arch Bridge Structure was installed over the Milestone Canal. It spans 28.6 metres with a height of only 3.2 metres. Over 60 precast units were made to achieve the total length of 36.735 metres.

Want More Information?

For further information regarding BEBO Arches please contact a member of our civils sales team on 028 2565 2566, Ext 3.